Internship programme
for UG, PG and Research scholars
on
IIT Pave and Design of PavementsDownload Pavement Design software (IIT Pave) using link provided in lectures, Design of Pavement section, Civil Engineer. The mechanistic empirical A flexible pavement structure is not easily amenable software called IIT-PAVE is used to analyze the to accurate structural analysis because the materials pavement responses. IIT Pave software is used for analyzing the strain (tensile and vertical) in pavements and later the obtained results are compared with the actual values of. It is a computer operating system based on the Debian Linux distribution and distributed as free and open source software, using its own desktop environment. Download link (direct CSE link): Ubuntu mirror. The activation procedure for Windows provided by IIT Delhi is as follows: 1.
Transportation Infrastructure: Planning And Design
Iitpave Software Tutorial
School of Civil Engineering, KIIT Deemed to be University aims at imparting theory,
practical and software application related to highway planning, pavement analysis and design through one month training programme to students of
Civil Engineering via online mode.
The training focuses on state of the art highway alignment planning, layout and cross section of roads, material characterisation, pavement design using IIT Pave. Most important part of this internship programme will be practice of pavement analysis as per IRC 37:2018 using IITPave for design flexible pavements. Preparation of BOQ or understanding of boq of road work will also be covered.
UG, PG and research scholars students of KIIT students and UG student of other institute
30 Days for Summer Research Internship for UG/PG / Research Scholars
- Faculty form KIIT
- Faculty from IIT Bhubaneswar
- Industry Expert
Iitpave Software Download
The training programme will be carried out in online mode by using any platform. To attend this class the following is needed:
- Uninterrupted high speed internet connection
- Laptop/desktop
- Free software resources
Day No | Module | Topic to be covered |
---|---|---|
Day 1 | Module1: Introduction to Transportation Infrastructure in India | Transportation Infrastructures in India. Categories of roads. Future Development of Road Infrastructure |
Day 2 | Module 2: Layout and Cross Section of National Highway | Layout and Geometrics of typical section of highways in cutting and filling |
Day 3 | Reading of GA, layout plan and detail construction drawings of road works | |
Day 4 | Reading of GA, layout plan and detail construction drawings of road works | |
Day 5 | Reading of GA, layout plan and detail construction drawings of road works | |
Day 6 | Module 3: Pavement Materials and Layers | Introduction to Orange Book: MORTH Specification for Road and Bridge Works |
Day 7 | Subgrade, unbound and bound base, Stabilised/Bound Base and subbase | |
Day 8 | Bituminous layers, modified and unmodified binder, bituminous mix and hot and cold bituminous mix | |
Day 9 | Module 4: Design of Flexible Pavements as per IRC 37:2018 using IIT PAVE software | Introduction & Principles of pavement design. |
Day 10 | Design of flexible pavements as per IRC:37-2018 | |
Day 11 | Use of IIT Pave for pavement design | |
Day 12 | Use of IIT Pave for pavement design | |
Day 13 | Use of IIT Pave for pavement design | |
Day 14 | Design of a flexible pavement using traffic survey data | |
Day 15 | Design of a flexible pavement using traffic survey data | |
Day 16 | New Technologies on Flexible Pavement | |
Day 17 | Perpetual Pavement | |
Day 18 | Module 5: Case Studies of Road design and Construction | Case studies of critical issues in Rural Roads |
Day 19 | Case Studies | |
Day 20 | Case Studies | |
Day 21 | Module 6: Estimation of Road Works | Various Items of road works, item description, theory of estimation |
Day 22 | BOQ and cost estimation of a road work | |
Day 23 | BOQ and cost estimation of a road work | |
Day 24 | Project Submission | Final Discussion and Project Submission |
Prof. Dipti Ranjan Biswal
Associate Professor
Email : [email protected]
Phone : 9583595895
In order to best serve the faculty and student community of Illinois Institute of Technology, the Office of Technology Services (OTS) is uses the following processes and procedures for managing the software applications installed in all OTS managed PC labs.
- Accurate and up-to-date lists of all installed software for all OTS PC labs can be found on the Academic Computer Labs page.
- Any member of the IIT community is always encouraged to submit questions regarding OTS PC Lab policies and procedures by contacting the OTS Support Desk by phone at 312.567.DESK (312.567.3375), by email at supportdesk@iit.edu, or by website at support.iit.edu.
Adding or Removing of PC Lab Software
OTS encourages faculty members to request any changes to the existing PC Lab software images as soon as possible. Any faculty member requesting changes or new software should contact the OTS Support Desk by email at supportdesk@iit.edu. Information on software requirements and funding of PC lab software can be found in following sections of this document. OTS seeks to have all labs completely operational on the first day of classes each semester. In order to accomplish this goal OTS staff must abide by the following timeline:
- 8-weeks Before the Start of Each Semester
Create a test image including all proposed software packages to be tested for a period of 3-weeks. Individuals requesting the addition of a software package will be notified of the software’s success or failure during this period. - 4-weeks Before the Start of the Semester
Begin the installation of final tested hard-drive images onto individual lab PCs.
Based on this schedule, OTS will send out four separate email notifications to all academic department coordinators. The first two notifications will be coordinated with the registrar and be submitted 10- to 12-weeks before the start of the new semester. Total validator pro crack. These notifications will include a list of existing labs software image and the procedure to request the addition/removal of a software package.
The third notification will be communicated 8-weeks before the start of the semester and contain a list of proposed software packages to be included on the lab PCs. The final notification will be sent 4-weeks before the start of the semester. It will contain a final list of software packages to be installed on the lab PCs.
Gintama season 1 episode 1. You Are watching Gintama Silver Soul Arc /. Watch and Download Gintama or Gintama 2015 English. Gintama Subtitle Indonesia, Subtitle English, batch sub indo, batch sub eng, zip, pack, full episode, Gintama 480p, 720p, 1080p, Episode 1, Episode 2, Episode. Television Series. English subtitles - kitsunekko.net. I m not sure about subs but you can download anime with subs from here. Answered Mar 1, 2018.
The removal of a software application from lab PCs can be initiated by OTS or an academic department that is currently paying the software license fees. If OTS initiates the removal of software, OTS will notify all faculty members and academic department contacts at least 12-weeks prior to the start of the next semester. Academic departments can request software applications be removed at any time by sending their request by email to supportdesk@iit.edu. Please request software removal at least 8-weeks prior to the start of the next semester to ensure that OTS can notify all faculty members of the change. No software will be removed from a lab once the final image is defined.
PC Lab Software Requirements
Software must be written for, or compatible with, the Windows 10 operating system. All software applications must pass testing for compatibility with existing lab hardware/software.
Funding of PC Lab Software
OTS uses the following criteria to determine funding responsibilities for software license fees:
OTS is Responsible For License Fees of Software That
Iit Pave Software
- Relates to the PC operating system and office suite applications;
- Provides administrative functionality (i.e., anti-virus software); and/or
- Currently installed titles that are used by classes in multiple colleges and already funded by OTS.
Colleges Will be Responsible for License Fees of Software That
- Is used for research purposes
- Is used by a class in a single college
- For which there is an existing installed software application that provides similar functionality
- New titles requested by that college
To Request Information About Hardware or Software in the OTS PC Labs
All information contained in this document, as well as OTS PC lab locations, hours, installed software, and hardware can be found on the Academic Computer Labs page. Any questions or comments should be directed to the OTS Support Desk by phone at 312.567.3375, by email at supportdesk@iit.edu, or though the web at support.iit.edu.
Iitpave Software Price
Pavement Design/Analysis Software
Important Note:
The following programs can be downloaded and be used by students in CE475 or CE575 for educational purposes only.
KENPAVE: Art of princess mononoke pdf to jpg. This suite includes KENLAYER and KENSLAB. It is provided on a CD with the textbook (2003 edition).
Download Example on 5-layer analysis using Kenpave:
Description of the problem PDF File,
Input .dat files 1 and 2 (Note: file 1 for q=85 psi, and file 2 for q=120 psi)
Output text files 1 and 2 (Kenpave output files)
Analysis and Plots Excel File
WinJULEA This is a demo version of the software, which is under development for the AASHTO 2002 design guide. The copy posted here is the one available on the NHI course 131064 CD (FHWA, April 2002). No support or manual is available.
CHEVPCThis is a PC version of the Fortran program of the Chevron Elastic Layer Analysis program.
WESLEA Waterways Engineering Station Elastic Layer Analysis Pavement Suite.
AASHTO_EALF.xls An Excel Tool developed by Dr. Bayomy for the AASHTO Equivalent Axle Load Factors for Flexible and Rigid pavements.
AASHTO_Rigid.xls An Excel Tool developed by the FHWA Long-Term Pavement Performance (LTPP) program to supplement the AASHTO pavement rigid design system. For help on the use of this Excel tool, you can download its instruction text file.
PCAPAV For damage analysis of PCC pavements based on the PCA design method. This DOS-based program was released in 1990. Download Example File.
You can obtain information on how to obtain your own copy from the American Concrete Pavement Association (ACPA) web site.
Iit Kharagpur Iitpave Software
MODULUS 5.1 Backcalculation Program (Texas Transportation
DARWin 2.0 (Pavement Design, Analysis and Rehabilitation for Windows).
This is a proprietary AASHTOWARE computer software product. The UI have a license for this software. It is available at the Highway Design Lab (BEL 117). Campus students are required to use it for their design activities. Video students are also encouraged to use it if they have an access to it, but not required. To obtain your copy, contact AASHTO.
WINFLEX 2000 A mechanistic-empirical overlay design system for flexible pavements. This software is developed by Dr. Fouad Bayomy under research contracts with Idaho transportation Department (ITD) at the UI Center for Transportation Infrastructure (CTI) of the National Institute for Advanced Transportation Technology (NIATT). To download the program, examples and user guide, click here.